High School for the Recording Arts
Built in 2013 in Saint Paul, MN. A recording charter high school, the studio portion of construction is built in the gym of a former health club with 20’ ceilings! Two control rooms, each with an iso booth, one shared large performance space, multiple small edit / composing / teaching rooms.
Studio design & consulting, collaborative construction with GC, studio glass, doors, acoustical treatment.

